10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.
These 10 free GAMP questions are organized by exam domain, so you can see how each part of the Georgia Master Plumber License Exam (Class II Unrestricted) blueprint is tested. Reveal the answer and explanation under each question.
Domain 1: Comply with General Laws 3.57% of exam
Question 1
An applicant documents 6 years of plumbing work covered by the Georgia State Plumbing Code, including 18 months while licensed as a Journeyman, plus commercial experience. The application includes three licensed-plumber references, two from Master Plumbers. What still prevents the applicant from meeting the Class II eligibility rule?
Show answer & explanation
Correct answer: C - The licensed Journeyman experience is less than two years
Domain 2: Comply with Regulations 10.71% of exam
Question 2
During inspection of a storage water heater, which relief-discharge arrangement requires correction?
Show answer & explanation
Correct answer: A - A 3/4-inch line uses internal-diameter-reducing insert fittings but remains 3/4 inch nominal
Domain 3: Work Planning/Organizing 5% of exam
Question 3
A plan uses a scale of 1/4 inch = 1 foot. Four identical pipe runs each measure 8.75 inches on the drawing. Pipe is ordered in 20-foot lengths, and the takeoff includes 8% waste. What is the minimum number of stock lengths to order?
Show answer & explanation
Correct answer: D - 8 lengths
Domain 4: Perform Pipe Cutting and Joining Activities 7.14% of exam
Question 4
An aboveground 4-inch cast-iron branch must transition to 4-inch PVC. Both sides will be independently supported so the coupling carries no pipe weight. Select the appropriate connection.
Show answer & explanation
Correct answer: B - A listed shielded transition coupling sized to both actual outside diameters
Question 5
While soldering a copper water line, the flux turns black and the solder beads on the tube instead of being drawn into the fitting cup. What is the best repair?
Show answer & explanation
Correct answer: C - Disassemble or cut out the joint, clean to bright metal, and remake it
Domain 5: Perform Plumbing Systems Installation Activities 15% of exam
Question 6
A building has a service PRV and a downstream check valve. Static pressure is 62 psi while the water heater is idle, climbs to 96 psi only during heater recovery, and falls after hot water is used. Which correction most directly addresses the cause?
Show answer & explanation
Correct answer: B - Service or size the expansion tank and set its air precharge to 62 psi
Question 7
A make-up water connection is classified by the authority as low hazard and is subject to both backsiphonage and backpressure. The equipment room cannot accommodate relief-port discharge. The specified testable assembly should be a:
Show answer & explanation
Correct answer: A - Double-check valve assembly
Question 8
For a 2-inch trap arm, the maximum distance to the vent is 8 feet, and the vent must connect before the arm drops more than one pipe diameter. Which installation complies?
Show answer & explanation
Correct answer: D - The vent connects at 7 feet after a 1.75-inch drop
Question 9
A residence will have 2.5 bathrooms and 4 bedrooms. The proposed storage water heater has a 58-gallon tank and a listed first-hour rating of 60 gallons. Under Georgia's residential first-hour-rating table, what is the correct conclusion?
Show answer & explanation
Correct answer: C - It does not comply; the minimum listed first-hour rating is 62 gallons
Question 10
During commissioning, a gas water heater's vent operates under positive pressure and carries condensate. Which classification and vent characteristic apply?
Show answer & explanation
Correct answer: B - Category IV - gas-tight, corrosion- and condensate-resistant venting
Domain 6: Perform System Testing Activities5% of exam
Domain 7: Perform Maintenance and Repair Activities10.71% of exam
Domain 8: Safety-related Issues10.71% of exam
Domain 9: Calculate the Following During Installation and Service: Offset, Volume, Area, Pressure, Depth, Circumference, Radius, Weight, and Related Quantities3.57% of exam
Domain 10: Comply with Business Laws10.71% of exam
Domain 11: Comply with Administrative Requirements10.71% of exam
Domain 12: Plumbing System Design7.14% of exam
That's 10 of 1,030